ANCHOR BERTH AND ANCHORING- All incoming vessels arrived at Hiran Point Anchor Berth are requested to pass the Mongla Fairway buoy before 02 (two) hrs of Highest High Water (HHW) at Hiran Point. While anchoring at Hiran Point Anchor Berth the Permissible length for vessel is 200m and draft 9.0m. Vessels may be encountered anchoring in the vicinity of the Mongla Fairway buoy.