WIND FARM UNDER CONSTRUCTION.

1. Construction of the Dogger Bank C Offshore Wind Farm will commence in mid 2024. The main Wind Farm Array work area will be marked by light-buoys in the following planned positions: 

	
Designation	Buoy Type	Position
 N1	      North Cardinal	55° 07.418N, 02° 34.283E
 N2	      North Cardinal	55° 07.438N, 02° 42.677E
 E1	      East Cardinal	55° 02.953N, 02° 51.690E
 E2	      East Cardinal	54° 58.621N, 02° 57.446E
S1	      South Cardinal	54° 57.020N, 02° 57.366E
S2	      South Cardinal	54° 57.251N, 02° 34.311E
W1	      West Cardinal	55° 02.331N, 02° 33.863E
SP1	      Special Mark      55° 07.426N, 02° 38.478E
SP2	      Special Mark      55° 05.943N, 02° 45.683E
SP3	      Special Mark      55° 04.448N, 02° 48.688E
SP4	      Special Mark      55° 00.787N, 02° 54.570E
SP5	      Special Mark      54° 57.066N, 02° 52.755E
SP6	      Special Mark      54° 57.112N, 02° 48.144E
SP7	      Special Mark      54° 57.158N, 02° 43.533E
SP8	      Special Mark      54° 57.204N, 02° 38.922E
SP9	      Special Mark      54° 59.791N, 02° 34.087E
SP10	      Special Mark      55° 04.878N, 02° 34.074E

2. All vessels should navigate with caution in the area. A safety zone of 500 metres becomes operational around the turbines under construction. 
3. Cable laying operations will be conducted between the new wind farm and Redcar Sands 54 36.166N, 01 01.810W
4. These and other changes will be included in the next New Edition of Chart 266.
