5813(P)/25 EGYPT  Red Sea Coast Spoil ground.Depths.Buoyage.Channel.Breakwaters.Dredged areas.Works.Reclamation area.Light.		
Source: ENC EG5EGR12 and EG3GOS01																																
	1.	Significant changes to charted detail have taken place in the approaches to and within the North port of Ain Sukhna. The most significant of 		these are as follows:															
																	
	2.	The existing spoil ground has been extended, joining the following positions																										
		29 38' .76N.,32 26' .06E.															
		29 38' .76N.,32 27' .50E.															
		29 37' .76N.,32 27' .50E.															
		29 37' .76N.,32 26' .06E.															
																	
	3.	Depths less than charted exist within the spoil ground. The most significant are as follows:																									
		Depth						Position
									
		273m						29 38' .09N.,32 26' .15E.									
		*31m						29 38' .71N.,32 26' .97E.									
		*31m						29 37' .97N.,32 27' .16E.									
																	
	4.	The East cardinal buoy in position 29 38' .89N.,32 24' .51E.has been amended toQ(3)10s.													
	5.	Reclamation has taken place on the approach to the port resulting in significant changes to the coastline North and South of the approach 		channel.

	6.	The North breakwater has been extended to position 29 39' .02N.,32 22' .58E.																										
	7.	The South breakwater has been extended to position 29 38' .63N.,32 22' .56E.																									
	8.	*The following lights have been moved:																												
		Characteristic					Former Position					New Position	
	
		Fl.G.6M						29 39' .02N.,32 22' .21E.			29 39' .02N.,32 22' .58E.
		
		Fl.R.6M						29 38' .63N.,32 22' .31E.			29 38' .63N.,32 22' .56E.		
																	
	9.	*A cargo transhipment area has been established within an area bounded by the following positions:																							
		29 43' .70N.,32 28' .27E.															
		29 43' .70N.,32 25' .79E.															
		29 41' .30N.,32 25' .79E.															
		29 41' .30N.,32 28' .27E.															
																	
	10.	Two new outer breakwaters have been established in the following positions:																											
		Designation							Position									
		North Outer breakwater						29 39' .93N.,32 21' .64E.									
										29 39' .93N.,32 22' .32E.									
																	
		and															
																	
		Designation							Position									
		South Outer breakwater						29 37' .55N.,32 21' .74E.									
										29 37' .63N.,32 22' .50E.									
																	
	11.	Buoys have been removed as follows:															
																	
		Characteristic				Buoy Type						Position	
	
		VQ					North Cardinal						29 38' .73N.,32 21' .06E.	
	
		VQ					North Cardinal						29 38' .73N.,32 20' .91E.	
	
		VQ					North Cardinal						29 38' .74N.,32 20' .77E.	
	
		VQ					North Cardinal						29 38' .73N.,32 20' .64E.	
	
		VQ					North Cardinal						29 38' .73N.,32 20' .49E.	
	
		Fl(2)R.5s				Spar							29 38' .73N.,32 20' .35E.		
																	
	12.	*A new North Ain Sukhna container terminal has been established dredged to 18m with turning circle, the new terminal is bounded by the 			following positions:															
																	
		29 38' .88N.,32 21' .15E.															
		29 38' .88N.,32 20' .28E.															
		29 39' .66N.,32 19' .76E.															
		29 39' .57N.,32 19' .58E.															
		29 39' .13N.,32 19' .87E.															
		29 38' .87N.,32 19' .57E.															
		29 38' .87N.,32 19' .13E.															
		29 38' .67N.,32 19' .13E.															
		29 38' .69N.,32 21' .15E.																													
	13.	The front leading light, in position 29 38' .82N.,32 19' .54E.has been moved to the following position, 29 38' .82N.,32 			19' .01E.The leading lines and bearings remain unchanged.																													
	14.	*Excavation works are taking place to establish a further new container terminal in the vicinity of position 29 38' .35N.,32 21' .24E.																		
	15.	*Chart 2132 panel A will be withdrawn in early 2026.																										
	16.	*These changes will be included in the next New Edition of Chart 2133 to be published early 2026.																					
	17.	Mariners are advised to navigate with caution in the area and consult the local port authorities for the latest information.																		
	18.	*Former Notice 1511(P)/25 is cancelled.																													
		*Indicates new or revised entry.																													
		(WGS84 DATUM)